You don't have javascript enabled. Good luck with that.
Pencarian
Tujuh PJU di Taman Sari Diperbaiki

Seven Street Lights in Taman Sari Repaired

Taman Sari Sub-distrit Bina Marga Task Force repaired 7 street lights (PJUs) in 7 different locations. After repaired it, personnel also monitored PJUs routinely.

Most lights are damaged due to heavy rain

Bina Marga Task Force Head, Shely Sapta Budyana mentioned, her side repaired 7 JPUs on Jl. Kemurnian VI, Jl. Kerajinan I, Jl. Kebon Jeruk III, Jl. Kebon Jeruk II, Jl. Kebon Jeruk I, Jl. Kebon Jeruk V, and Jl. Kebon Jeruk VII. Those PJUs were repaired to follow up residents' request submitted through CRM application.

Central Jakarta Bina Marga Replaces PJU's Electrical Cables

"Most lights are damaged due to heavy rain. Short circuit often occurs in rainy season. Some smart system street lights turn off easily," she explained, Wednesday (3/10).

Moreover, her side also detected damaged in smart system lights' network from special application in Bina Marga Sub-agency. That application is connected with monitor screen at West Jakarta Bina Marga Sub-agency. That post directly monitored PJUs thus her side could detect immediately when the lights went out.

"There are various repair, if the armarture is damaged, the lamp should be removed and repaired by vendor who owned the lamp brand. It takes 3 days to 2 weeks to repair it. But if the damage is in the system, we can repair it immediately," she said.

Lights checking and repair were carried out by 4 personnel using cars with stairs and ampere to check electric current.

"We hope to finish the repair today. Thus road users and pedestrians can feel safe and comfortable," she closed.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye972 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye934 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye829 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye607 personAnita Karyati